Dansa Inno level bars can be used as casting RC level posts for veneer installation of slab floor scaffolding.
(For installation, level bars can be fixed by using steel polling supports on the lower part or driving nails into the veneer as the level bars have nail holes.)
Eliminate the checking bar by pulling it up after concrete depositing is finished.
When pitching the up-down level, release the fixing bolt, adjust the leveling point by grabbing the pitch bolt and then fasten the fixing bolt.